- Environmental & Engineering Studies - Completed
- Submission of VPA's Environmental Application - Completed
- Application Review - Completed
- Planned Construction - Commenced 2007
-
Commissioning Q4 2009/Operational Q1 2010 Download schematic - click to view
|
- Addition of approximately 20.2 ha (50 acres) of land and creation of third berth, increasing berth length from 670m (2,198') to 1,135m (3,724').
- Handle 3 x 325m (1,066') vessels at simultaneously.
- Berth depth same as existing 2 berths (15.8m or 52')
Deltaport Aerial - click to view
|